IRS/2021/79/PON1
Notification details
Status | Completed |
---|---|
First observed date | 08 October 2021 |
First observed time | 12:17 |
Incident type(s) | Chemical release |
Organisations involved | DANA PETROLEUM (E&P) LIMITED |
Installation | Triton FPSO |
Installation type | Production installation (including any connected infrastructure) |
Field | |
Latitude | 57° 5' 2.0'' N |
Longitude | 0° 53' 38.0'' E |
Quadrant / block no. | 21 / 30 |
Chemical 1
Chemical product released | enerpac HF95Y |
---|---|
Total quantity of chemical released | 0.5 kg |
Formal investigation
Formal investigation ever opened | No |
---|
Close off details
Release ever ongoing | No |
---|
Source details
Source | Shipside Hydraulic valve - Isolation Failure / Passing Valve |
---|