Back

IRS/2021/277/PON1

Notification details

Status Completed
First observed date 10 November 2021
First observed time 15:00
Incident type(s) Oil release
Organisations involved HARBOUR ENERGY PLC
Installation Hoist lubricator releasing hydraulic oil pressure as per design
Installation type NPI
Field Boulton HM
Latitude 54° 11' 18.0'' N
Longitude 2° 12' 33.0'' E
Quadrant / block no. 44 / 22

Oil release details

Oil product released Hydraulic Oil
How was the quantity released determined Calculated
Total quantity of oil released .00000004 tonnes

Formal investigation

Formal investigation ever opened No

Close off details

Release ever ongoing Yes

Source details

Source Hose (Topsides, Not Bunkering) - drip associated with fitting