Back

IRS/2022/861/PON1

Notification details

Status Completed
First observed date 03 March 2022
First observed time 14:30
Incident type(s) Oil release
Organisations involved TOTALENERGIES E&P UK LIMITED
Installation Dunbar Platform
Installation type Production installation (including any connected infrastructure)
Field DUNBAR
Latitude 60° 37' 44.0'' N
Longitude 1° 39' 2.0'' E
Quadrant / block no. 3 / 14

Oil release details

Oil product released Seal Oil
How was the quantity released determined Calculated
Total quantity of oil released 0.002339 tonnes

Formal investigation

Formal investigation ever opened No

Close off details

Release ever ongoing Yes

Source details

Source Drainage Systems - Residual oil in caisson