Back

IRS/2022/1012/PON1

Notification details

Status In review
First observed date 03 June 2015
First observed time 11:00
Incident type(s) Chemical release
Organisations involved CHRYSAOR NORTH SEA LIMITED
Installation Gaupe SSIV hydraulic control line
Installation type Production installation (including any connected infrastructure)
Field GAUPE
Latitude 57° 58' 17.0'' N
Longitude 1° 51' 41.0'' E
Quadrant / block no. 22 / 5

Formal investigation

Formal investigation ever opened No