Back

IRS/2022/1445/PON1

Notification details

Status Completed
First observed date 06 July 2022
First observed time 04:30
Incident type(s) Oil release
Organisations involved ENI ENERGY E&P UK LIMITED
Installation Cygnus A PU Platform
Installation type Production installation (including any connected infrastructure)
Field
Latitude 54° 34' 7.11'' N
Longitude 2° 17' 23.11'' E
Quadrant / block no. 44 / 11

Oil release details

Oil product released Condensate
How was the quantity released determined Calculated
Total quantity of oil released .004 tonnes

Formal investigation

Formal investigation ever opened No

Close off details

Release ever ongoing No

Source details

Source Drainage Systems - Pipework Failure