IRS/2022/1445/PON1
Notification details
Status | Completed |
---|---|
First observed date | 06 July 2022 |
First observed time | 04:30 |
Incident type(s) | Oil release |
Organisations involved | ENI ENERGY E&P UK LIMITED |
Installation | Cygnus A PU Platform |
Installation type | Production installation (including any connected infrastructure) |
Field | |
Latitude | 54° 34' 7.11'' N |
Longitude | 2° 17' 23.11'' E |
Quadrant / block no. | 44 / 11 |
Oil release details
Oil product released | Condensate |
---|---|
How was the quantity released determined | Calculated |
Total quantity of oil released | 0.004 tonnes |
Formal investigation
Formal investigation ever opened | No |
---|
Close off details
Release ever ongoing | No |
---|
Source details
Source | Drainage Systems - Pipework Failure |
---|