Back

IRS/2023/2446/PON1

Notification details

Status Completed
First observed date 15 February 2023
First observed time 15:00
Incident type(s) Oil release
Organisations involved SPIRIT ENERGY PRODUCTION UK LIMITED
Installation CPC
Installation type Production installation (including any connected infrastructure)
Field SOUTH MORECAMBE
Latitude 53° 50' 48.21'' N
Longitude 3° 34' 50.78'' W
Quadrant / block no. 110 / 3

Oil release details

Oil product released Hydraulic Oil
How was the quantity released determined Calculated
Total quantity of oil released .000445 tonnes

Formal investigation

Formal investigation ever opened No

Close off details

Release ever ongoing No

Source details

Source Cranes - Hydraulic System