Back

IRS/2023/2596/PON1

Notification details

Status Completed
First observed date 22 March 2023
First observed time 10:00
Incident type(s) Oil release
Organisations involved bp
Installation Clair Phase 1 Platform
Installation type Production installation (including any connected infrastructure)
Field CLAIR-PHASE 1 [Part of CLAIR]
Latitude 60° 41' 30.0'' N
Longitude 2° 32' 40.0'' W
Quadrant / block no. 206 / 8

Oil release details

Oil product released Crude
How was the quantity released determined Calculated
Total quantity of oil released .00443 tonnes

Formal investigation

Formal investigation ever opened No

Close off details

Release ever ongoing No

Source details

Source Wellheads - Flushing the A22 wellhead post wireline intervention, the equipment used was derigged, oil left in equipment has dripped down the caisson