Back

IRS/2023/2885/PON1

Notification details

Status Completed
First observed date 05 June 2023
First observed time 16:00
Incident type(s) Oil release
Organisations involved CNOOC PETROLEUM EUROPE LIMITED
Installation Golden Eagle W Platform
Installation type Production installation (including any connected infrastructure)
Field GOLDEN EAGLE
Latitude 57° 57' 38.71'' N
Longitude 0° 54' 58.39'' W
Quadrant / block no. 14 / 26

Oil release details

Oil product released Hydraulic Oil
How was the quantity released determined Calculated
Total quantity of oil released 0.0000706 tonnes

Formal investigation

Formal investigation ever opened No

Close off details

Release ever ongoing No

Source details

Source Hydraulic Manifold/Control Panel - Small Bore Fittings