IRS/2023/2889/PON1

Notification details

Status Completed
First observed date 17 May 2023
First observed time 15:00
Incident type(s) Oil release
Organisations involved EQUINOR UK LIMITED
Installation Mariner PDQ Platform
Installation type Production installation (including any connected infrastructure)
Field
Latitude 59° 35' 20.77'' N
Longitude 1° 3' 25.35'' E
Quadrant / block no. 9 / 11

Oil release details

Oil product released Oily Waste
How was the quantity released determined Calculated
Total quantity of oil released 0.007 tonnes

Formal investigation

Formal investigation ever opened No

Close off details

Release ever ongoing No

Source details

Source Drains - design of drainage system has been ivestigated, engineering solution required but operation amended as mitigation in short term.