Back

IRS/2023/2916/PON1

Notification details

Status Completed
First observed date 14 June 2023
First observed time 01:00
Incident type(s) Oil release
Organisations involved REPSOL RESOURCES UK LIMITED
Installation Montrose A Platform
Installation type Production installation (including any connected infrastructure)
Field MONTROSE
Latitude 57° 26' 59.46'' N
Longitude 1° 23' 12.5'' E
Quadrant / block no. 22 / 17

Oil release details

Oil product released Hydraulic Oil
How was the quantity released determined Measured
Total quantity of oil released 0.00002972 tonnes

Formal investigation

Formal investigation ever opened No

Close off details

Release ever ongoing No

Source details

Source ROV/Vessel Operations