Back

IRS/2023/3365/PON1

Notification details

Status Completed
First observed date 30 September 2023
First observed time 13:45
Incident type(s) Oil release
Organisations involved ITHACA ENERGY (UK) LIMITED
Installation Alba Northern Platform
Installation type Production installation (including any connected infrastructure)
Field ALBA
Latitude 58° 3' 31.0'' N
Longitude 1° 4' 53.0'' E
Quadrant / block no. 16 / 26

Oil release details

Oil product released Diesel
How was the quantity released determined Calculated
Total quantity of oil released .00392 tonnes

Formal investigation

Formal investigation ever opened No

Close off details

Release ever ongoing No

Source details

Source Bunkering Hose - Sheared