Back

IRS/2023/3588/PON1

Notification details

Status Completed
First observed date 06 November 2023
First observed time 09:50
Incident type(s) Oil release
Organisations involved SPIRIT ENERGY PRODUCTION UK LIMITED
Installation Morecambe South DP6 Platform
Installation type Production installation (including any connected infrastructure)
Field SOUTH MORECAMBE
Latitude 53° 51' 51.0'' N
Longitude 3° 37' 5.0'' W
Quadrant / block no. 110 / 2

Oil release details

Oil product released Hydraulic Oil
How was the quantity released determined Measured
Total quantity of oil released .204 tonnes

Formal investigation

Formal investigation ever opened No

Close off details

Release ever ongoing No

Source details

Source Valves - Actuator indicator cap