Back

IRS/2023/3599/PON1

Notification details

Status Completed
First observed date 04 November 2023
First observed time 10:30
Incident type(s) Oil release
Organisations involved EQUINOR UK LIMITED
Installation Drilling drains collection tank
Installation type Production installation (including any connected infrastructure)
Field MARINER
Latitude 59° 35' 18.176'' N
Longitude 1° 3' 17.0'' E
Quadrant / block no. 9 / 11

Oil release details

Oil product released Oily Waste
How was the quantity released determined Calculated
Total quantity of oil released 0.0002 tonnes

Formal investigation

Formal investigation ever opened No

Close off details

Release ever ongoing No

Source details

Source Drains - commissioning of deluge system overflowed drains to sea