Back

IRS/2024/4401/PON1

Notification details

Status Completed
First observed date 28 April 2024
First observed time 05:00
Incident type(s) Oil release
Organisations involved EQUINOR UK LIMITED
Installation Mariner PDQ Platform
Installation type Production installation (including any connected infrastructure)
Field MARINER
Latitude 59° 35' 18.716'' N
Longitude 1° 3' 19.323'' E
Quadrant / block no. 9 / 11

Oil release details

Oil product released Oily Waste
How was the quantity released determined Calculated
Total quantity of oil released 0.00001 tonnes

Formal investigation

Formal investigation ever opened No

Close off details

Release ever ongoing No

Source details

Source Drainage Systems - Overflow Of Deck Drains