Back

IRS/2024/4132/PON1

Notification details

Status Completed
First observed date 29 February 2024
First observed time 13:50
Incident type(s) Oil release
Organisations involved CHRYSAOR PRODUCTION (U.K.) LIMITED, DOLPHIN DRILLING LIMITED
Installation Paul B. Loyd, Jnr
Installation type Vessel
Field CALLANISH
Latitude 58° 0' 10.304'' N
Longitude 0° 43' 25.876'' E
Quadrant / block no. 15 / 29

Oil release details

Oil product released Hydraulic Oil
How was the quantity released determined Measured
Total quantity of oil released 0.0017 tonnes

Formal investigation

Formal investigation ever opened No

Close off details

Release ever ongoing No

Source details

Source Pipework - Sheared