IRS/2024/4931/PON1
Notification details
Status | Completed |
---|---|
First observed date | 29 August 2024 |
First observed time | 12:00 |
Incident type(s) | Oil release |
Organisations involved | SPIRIT ENERGY PRODUCTION UK LIMITED |
Installation | Morecambe South AP1 Platform |
Installation type | Production installation (including any connected infrastructure) |
Field | SOUTH MORECAMBE |
Latitude | 53° 50' 44.0'' N |
Longitude | 3° 35' 0.0'' W |
Quadrant / block no. | 110 / 3 |
Oil release details
Oil product released | Hydraulic Oil |
---|---|
How was the quantity released determined | Measured |
Total quantity of oil released | 0.0074 tonnes |
Formal investigation
Formal investigation ever opened | No |
---|
Close off details
Release ever ongoing | No |
---|
Source details
Source | Turbines, Pumps, etc. - Accumulator Failure |
---|