IRS/2024/4996/PON1
Notification details
| Status | Completed |
|---|---|
| First observed date | 12 September 2024 |
| First observed time | 15:00 |
| Incident type(s) | Oil release |
| Organisations involved | INEOS E&P (UK) LIMITED |
| Installation | Clipper South |
| Installation type | Production installation (including any connected infrastructure) |
| Field | |
| Latitude | 53° 24' 16.67'' N |
| Longitude | 1° 47' 5.13'' E |
| Quadrant / block no. | 48 / 19 |
Oil release details
| Oil product released | Hydraulic Oil |
|---|---|
| How was the quantity released determined | Measured |
| Total quantity of oil released | 0.201 tonnes |
Formal investigation
| Formal investigation ever opened | No |
|---|
Close off details
| Release ever ongoing | No |
|---|
Source details
| Source | Hydraulic Manifold/Control Panel - Small Bore Fittings |
|---|