Back

IRS/2024/5033/PON1

Notification details

Status Completed
First observed date 19 September 2024
First observed time 13:30
Incident type(s) Oil release
Organisations involved PETROFAC FACILITIES MANAGEMENT LIMITED, COSL DRILLING EUROPE AS
Installation COSLInnovator
Installation type NPI
Field GANNET E
Latitude 57° 5' 25.3'' N
Longitude 0° 50' 56.6'' E
Quadrant / block no. 21 / 30

Oil release details

Oil product released Hydraulic Oil
How was the quantity released determined Measured
Total quantity of oil released 0.0002 tonnes

Formal investigation

Formal investigation ever opened No

Close off details

Release ever ongoing No

Source details

Source ROV/Vessel Operations