Back

IRS/2024/5116/PON1

Notification details

Status Completed
First observed date 05 October 2024
First observed time 16:00
Incident type(s) Oil release
Organisations involved BP EXPLORATION OPERATING COMPANY LIMITED
Installation Clair Phase 1 Platform
Installation type Production installation (including any connected infrastructure)
Field CLAIR
Latitude 60° 41' 30.0'' N
Longitude 2° 32' 40.0'' W
Quadrant / block no. 206 / 8

Oil release details

Oil product released Hydraulic Oil
How was the quantity released determined Measured
Total quantity of oil released 0.01 tonnes

Formal investigation

Formal investigation ever opened No

Close off details

Release ever ongoing No

Source details

Source Cranes - Hydraulic System