Back

IRS/2024/5186/PON1

Notification details

Status Completed
First observed date 21 October 2024
First observed time 01:15
Incident type(s) Oil release
Organisations involved CHRYSAOR (U.K.) BRITANNIA LIMITED
Installation Britannia Platform
Installation type Production installation (including any connected infrastructure)
Field BRITANNIA
Latitude 58° 2' 55.13'' N
Longitude 1° 8' 19.54'' E
Quadrant / block no. 16 / 26

Oil release details

Oil product released Diesel
How was the quantity released determined Calculated
Total quantity of oil released 0.2 tonnes

Formal investigation

Formal investigation ever opened No

Close off details

Release ever ongoing No

Source details

Source Diesel Systems - Failure Of Equipment