Back

IRS/2024/5359/PON1

Notification details

Status Completed
First observed date 24 November 2024
First observed time 13:30
Incident type(s) Oil release
Organisations involved TOTALENERGIES E&P UK LIMITED
Installation Elgin Wellhead Platform A
Installation type Production installation (including any connected infrastructure)
Field
Latitude 57° 0' 7.0'' N
Longitude 1° 50' 4.0'' E
Quadrant / block no. 20 / 30

Oil release details

Oil product released Hydraulic Oil
How was the quantity released determined Calculated
Total quantity of oil released 0.0007 tonnes

Formal investigation

Formal investigation ever opened No

Close off details

Release ever ongoing No

Source details

Source Hose (Topsides, Not Bunkering) - Release From Joint