Back

IRS/2025/5711/PON1

Notification details

Status Completed
First observed date 27 January 2025
First observed time 08:00
Incident type(s) Oil release
Organisations involved CHRYSAOR PETROLEUM COMPANY U.K. LIMITED
Installation Ensco 120
Installation type NPI
Field J Block
Latitude 56° 41' 58.0'' N
Longitude 2° 20' 20.0'' E
Quadrant / block no. 2 / 30

Oil release details

Oil product released Mineral Oil
How was the quantity released determined Measured
Total quantity of oil released 0.00225 tonnes

Formal investigation

Formal investigation ever opened No

Close off details

Release ever ongoing No

Source details

Source Hydraulic Manifold/Control Panel - Hydraulic Hose