Back

IRS/2025/6747/PON1

Notification details

Status Completed
First observed date 28 September 2025
First observed time 23:42
Incident type(s) Oil release
Organisations involved CHRYSAOR PRODUCTION (U.K.) LIMITED, DOLPHIN DRILLING LIMITED
Installation Paul B. Loyd, Jnr
Installation type NPI
Field CALEDONIA
Latitude 58° 6' 10.068'' N
Longitude 1° 8' 39.0'' E

Oil release details

Oil product released Hydraulic Oil
How was the quantity released determined Measured
Total quantity of oil released 0.0004175 tonnes

Formal investigation

Formal investigation ever opened No

Close off details

Release ever ongoing No

Source details

Source ROV/Vessel Operations