Back

IRS/2025/6752/PON1

Notification details

Status In review
First observed date 29 September 2025
First observed time 09:00
Incident type(s) Chemical release
Organisations involved CHRYSAOR NORTH SEA LIMITED
Installation Armada Platform
Installation type Production installation (including any connected infrastructure)
Field FLEMING
Latitude 57° 57' 26.0'' N
Longitude 1° 50' 42.0'' E
Quadrant / block no. 22 / 5

Formal investigation

Formal investigation ever opened No