Back

IRS/2025/6815/PON1

Notification details

Status Completed
First observed date 02 October 2025
First observed time 09:00
Incident type(s) Oil release
Organisations involved DANA PETROLEUM (E&P) LIMITED
Installation Triton FPSO
Installation type Production installation (including any connected infrastructure)
Field Triton
Latitude 57° 5' 2.214'' N
Longitude 0° 53' 38.24'' E
Quadrant / block no. 21 / 30

Oil release details

Oil product released Crude
How was the quantity released determined Calculated
Total quantity of oil released 0.0000215 tonnes

Formal investigation

Formal investigation ever opened No

Close off details

Release ever ongoing No

Source details

Source Flaring/Venting - Flare Drop Out