Back

IRS/2025/7070/PON1

Notification details

Status In review
First observed date 09 December 2025
First observed time 05:52
Incident type(s) Chemical release
Organisations involved ADURA ENERGY LIMITED
Installation P-4200 Seawater lift pump
Installation type Production installation (including any connected infrastructure)
Field NELSON
Latitude 57° 39' 44.0'' N
Longitude 1° 8' 38.0'' E
Quadrant / block no. 22 / 11

Formal investigation

Formal investigation ever opened No