Back

IRS/2026/7400/PON1

Notification details

Status Completed
First observed date 05 March 2026
First observed time 20:32
Incident type(s) Chemical release
Organisations involved BP EXPLORATION OPERATING COMPANY LIMITED, NOBLE DRILLING UK LTD
Installation Mungo NUI Platform
Installation type Production installation (including any connected infrastructure)
Field MUNGO
Latitude 57° 22' 26.27'' N
Longitude 1° 59' 53.18'' E
Quadrant / block no. 22 / 20

Chemical 1

Chemical product released FLOTROL
Total quantity of chemical released 0.002565 kg

Chemical 2

Chemical product released FLO-VIS PLUS
Total quantity of chemical released 6.0E-4 kg

Chemical 3

Chemical product released MAGNESIUM OXIDE
Total quantity of chemical released 2.58E-4 kg

Chemical 4

Chemical product released M-I PAC (All Grades)
Total quantity of chemical released 0.00171 kg

Chemical 5

Chemical product released M-I WATE (All Grades)
Total quantity of chemical released 0.1248 kg

Chemical 6

Chemical product released NaCl - SODIUM CHLORIDE
Total quantity of chemical released 0.312 kg

Chemical 7

Chemical product released Nuosept®78
Total quantity of chemical released 8.7E-5 kg

Chemical 8

Chemical product released SAFE-SCAV NA
Total quantity of chemical released 1.29E-4 kg

Chemical 9

Chemical product released SODA ASH
Total quantity of chemical released 1.08E-4 kg

Formal investigation

Formal investigation ever opened No

Close off details

Release ever ongoing No

Source details

Source Small Bore Tubing - Fittings / Connections