IRS/2026/7805/PON1
Notification details
| Status | Completed |
|---|---|
| First observed date | 12 June 2026 |
| First observed time | 08:00 |
| Incident type(s) | Oil release |
| Organisations involved | PERENCO GAS (UK) LIMITED |
| Installation | Neptune Platform |
| Installation type | Production installation (including any connected infrastructure) |
| Field | NEPTUNE |
| Latitude | 53° 59' 0.11'' N |
| Longitude | 0° 47' 20.78'' E |
| Quadrant / block no. | 47 / 4 |
Oil release details
| Oil product released | Hydraulic Oil |
|---|---|
| How was the quantity released determined | Calculated |
| Total quantity of oil released | 0.0005 tonnes |
Formal investigation
| Formal investigation ever opened | No |
|---|
Close off details
| Release ever ongoing | No |
|---|
Source details
| Source | Fixed Chemical Pipework (Utility Chemicals) - Release From Joint |
|---|