Back

IRS/2026/7960/PON1

Notification details

Status Completed
First observed date 19 July 2026
First observed time 08:15
Incident type(s) Oil release
Organisations involved NEO NEXT+ ENERGY E&P UK LIMITED
Installation Dunbar Platform
Installation type Production installation (including any connected infrastructure)
Field
Latitude 60° 37' 45.92'' N
Longitude 1° 39' 8.85'' W
Quadrant / block no. 3 / 14

Oil release details

Oil product released Hydraulic Oil
How was the quantity released determined Calculated
Total quantity of oil released 0.0088 tonnes

Formal investigation

Formal investigation ever opened No

Close off details

Release ever ongoing No

Source details

Source Hose (Topsides, Not Bunkering) - Total Rupture