Back

IRS/2026/8015/PON1

Notification details

Status In review
First observed date 03 August 2026
First observed time 12:45
Incident type(s) Chemical release
Organisations involved ADURA OPERATIONS LIMITED
Installation Shearwater C PUQ Platform
Installation type Production installation (including any connected infrastructure)
Field SHEARWATER
Latitude 57° 1' 53.0'' N
Longitude 1° 57' 19.0'' E
Quadrant / block no. 22 / 30

Formal investigation

Formal investigation ever opened No