IRS/2026/8181/PON1
Notification details
| Status | In review |
|---|---|
| First observed date | 15 September 2026 |
| First observed time | 15:00 |
| Incident type(s) | Oil release |
| Organisations involved | ADURA OPERATIONS LIMITED |
| Installation | haz drains caisson |
| Installation type | Production installation (including any connected infrastructure) |
| Field | |
| Latitude | 57° 39' 8.0'' N |
| Longitude | 1° 9' 2.0'' E |
Formal investigation
| Formal investigation ever opened | No |
|---|