Back

IRS/2021/145/PON2

Notification details

Status Completed
First observed date 19 October 2021
First observed time 18:40
Organisation involved ODE ASSET MANAGEMENT LIMITED
Installation Thames pipeline PL370 KP29
Field BLYTHE
Latitude 53° 4' 6.0'' N
Longitude 1° 41' 2.0'' E
Quadrant / block no. 48 / 23

Breached conditions details

Materials likely to float on sea surface or in water column Yes
Materials lost to sea resting on sea bed No

Formal investigation

Formal investigation ever opened No