IRS/2021/145/PON2
Notification details
Status | Completed |
---|---|
First observed date | 19 October 2021 |
First observed time | 18:40 |
Organisation involved | ODE ASSET MANAGEMENT LIMITED |
Installation | Thames pipeline PL370 KP29 |
Field | BLYTHE |
Latitude | 53° 4' 6.0'' N |
Longitude | 1° 41' 2.0'' E |
Quadrant / block no. | 48 / 23 |
Breached conditions details
Materials likely to float on sea surface or in water column | Yes |
---|---|
Materials lost to sea resting on sea bed | No |
Formal investigation
Formal investigation ever opened | No |
---|