IRS/2021/385/PON2
Notification details
Status | Completed |
---|---|
First observed date | 29 November 2021 |
First observed time | 08:00 |
Organisation involved | SPIRIT ENERGY PRODUCTION UK LIMITED |
Installation | CPC |
Field | CPC |
Latitude | 53° 50' 44.0'' N |
Longitude | 3° 35' 0.0'' W |
Quadrant / block no. | 110 / 3 |
Breached conditions details
Materials likely to float on sea surface or in water column | No |
---|---|
Materials lost to sea resting on sea bed | Yes |
Formal investigation
Formal investigation ever opened | No |
---|