Back

IRS/2022/886/PON2

Notification details

Status Completed
First observed date 08 March 2022
First observed time 16:20
Organisation involved PETROFAC FACILITIES MANAGEMENT LIMITED, CALENERGY NORTH SEA LIMITED
Installation NHD
Field ELGOOD
Latitude 53° 18' 22.0'' N
Longitude 1° 23' 2.0'' E
Quadrant / block no. 48 / 22

Breached conditions details

Materials likely to float on sea surface or in water column Yes
Materials lost to sea resting on sea bed No

Formal investigation

Formal investigation ever opened No