IRS/2022/1011/PON2
Notification details
Status | Completed |
---|---|
First observed date | 05 April 2022 |
First observed time | 11:15 |
Organisation involved | CHRYSAOR LIMITED |
Installation | Everest North Platform |
Field | EVEREST |
Latitude | 57° 45' 3.0'' N |
Longitude | 1° 48' 1.0'' E |
Quadrant / block no. | 22 / 10 |
Breached conditions details
Materials likely to float on sea surface or in water column | No |
---|---|
Materials lost to sea resting on sea bed | Yes |
Formal investigation
Formal investigation ever opened | No |
---|