IRS/2022/1385/PON2
Notification details
| Status | Completed |
|---|---|
| First observed date | 24 June 2022 |
| First observed time | 05:49 |
| Organisation involved | SHELL U.K. LIMITED |
| Installation | Arran South Drill Centre |
| Field | ARRAN |
| Latitude | 57° 28' 2.0'' N |
| Longitude | 2° 6' 9.0'' E |
| Quadrant / block no. | 23 / 16 |
Breached conditions details
| Materials likely to float on sea surface or in water column | No |
|---|---|
| Materials lost to sea resting on sea bed | Yes |
Formal investigation
| Formal investigation ever opened | No |
|---|