Back

IRS/2022/1409/PON2

Notification details

Status Completed
First observed date 28 June 2022
First observed time 19:40
Organisation involved CNOOC PETROLEUM EUROPE LIMITED
Installation Telford West/Marmion Manifold
Field TELFORD
Latitude 58° 12' 4.0'' N
Longitude 0° 16' 18.0'' E
Quadrant / block no. 15 / 22

Breached conditions details

Materials likely to float on sea surface or in water column No
Materials lost to sea resting on sea bed Yes

Formal investigation

Formal investigation ever opened No