IRS/2022/1755/PON2
Notification details
Status | Completed |
---|---|
First observed date | 11 September 2022 |
First observed time | 17:00 |
Organisation involved | TOTALENERGIES E&P UK LIMITED |
Installation | Elgin PUQ Platform |
Field | ELGIN |
Latitude | 57° 0' 7.0'' N |
Longitude | 1° 50' 3.0'' E |
Quadrant / block no. | 22 / 30 |
Breached conditions details
Materials likely to float on sea surface or in water column | No |
---|---|
Materials lost to sea resting on sea bed | No |
Formal investigation
Formal investigation ever opened | No |
---|