Back

IRS/2022/1800/PON2

Notification details

Status Completed
First observed date 23 September 2022
First observed time 02:55
Organisation involved TOTALENERGIES E&P UK LIMITED
Installation Elgin PUQ Platform
Field ELGIN
Latitude 57° 0' 39.0'' N
Longitude 1° 50' 10.0'' E
Quadrant / block no. 22 / 30

Breached conditions details

Materials likely to float on sea surface or in water column No
Materials lost to sea resting on sea bed Yes

Formal investigation

Formal investigation ever opened No