IRS/2022/2150/PON2
Notification details
Status | Completed |
---|---|
First observed date | 26 November 2022 |
First observed time | 21:53 |
Organisation involved | BP EXPLORATION OPERATING COMPANY LIMITED |
Installation | Liftmoor the tug boat for the Sandpiper Jackup rig |
Field | n/a |
Latitude | 53° 40' 23.6'' N |
Longitude | 0° 0' 7.8'' E |
Quadrant / block no. | 47 / 1 |
Breached conditions details
Materials likely to float on sea surface or in water column | No |
---|---|
Materials lost to sea resting on sea bed | Yes |
Formal investigation
Formal investigation ever opened | No |
---|