Back

IRS/2023/2457/PON2

Notification details

Status Completed
First observed date 18 February 2023
First observed time 07:00
Organisation involved TOTALENERGIES E&P NORTH SEA UK LIMITED
Installation Elgin PUQ Platform
Field ELGIN
Latitude 57° 0' 7.0'' N
Longitude 1° 50' 3.0'' E
Quadrant / block no. 22 / 30

Breached conditions details

Materials likely to float on sea surface or in water column Yes
Materials lost to sea resting on sea bed No

Formal investigation

Formal investigation ever opened No