IRS/2023/2719/PON2
Notification details
| Status | Completed |
|---|---|
| First observed date | 25 April 2023 |
| First observed time | 09:30 |
| Organisation involved | CENTRICA ENERGY STORAGE LIMITED |
| Installation | Rough BD Platform |
| Field | ROUGH |
| Latitude | 53° 50' 4.0'' N |
| Longitude | 0° 26' 34.0'' E |
| Quadrant / block no. | 47 / 03 |
Breached conditions details
| Materials likely to float on sea surface or in water column | No |
|---|---|
| Materials lost to sea resting on sea bed | Yes |
Formal investigation
| Formal investigation ever opened | No |
|---|