IRS/2023/2933/PON2
Notification details
Status | Completed |
---|---|
First observed date | 18 June 2023 |
First observed time | 01:30 |
Organisation involved | CHRYSAOR PRODUCTION (U.K.) LIMITED |
Installation | Ensco 92 |
Field | BOULTON |
Latitude | 54° 14' 40.101'' N |
Longitude | 2° 9' 9.104'' E |
Quadrant / block no. | 44 / 21 |
Breached conditions details
Materials likely to float on sea surface or in water column | No |
---|---|
Materials lost to sea resting on sea bed | Yes |
Formal investigation
Formal investigation ever opened | No |
---|