IRS/2023/3005/PON2
Notification details
| Status | Completed |
|---|---|
| First observed date | 03 July 2023 |
| First observed time | 14:00 |
| Organisation involved | BP P.L.C. |
| Installation | Foinaven DC1 Manifold |
| Field | FOINAVEN |
| Latitude | 60° 18' 40.28'' N |
| Longitude | 4° 20' 9.696'' W |
| Quadrant / block no. | 204 / 24 |
Breached conditions details
| Materials likely to float on sea surface or in water column | No |
|---|---|
| Materials lost to sea resting on sea bed | Yes |
Formal investigation
| Formal investigation ever opened | No |
|---|