Back

IRS/2023/3263/PON2

Notification details

Status Completed
First observed date 05 September 2023
First observed time 14:00
Organisation involved PETROFAC FACILITIES MANAGEMENT LIMITED
Installation Hewett 52/5 A Platform
Field HEWETT
Latitude 52° 59' 58.6'' N
Longitude 1° 50' 51.5'' W
Quadrant / block no. 52 / 5

Breached conditions details

Materials likely to float on sea surface or in water column No
Materials lost to sea resting on sea bed Yes

Formal investigation

Formal investigation ever opened No