IRS/2023/3353/PON2
Notification details
| Status | Completed |
|---|---|
| First observed date | 23 September 2023 |
| First observed time | 16:00 |
| Organisation involved | APACHE BERYL I LIMITED |
| Installation | Beryl B Platform |
| Field | BERYL |
| Latitude | 59° 36' 38.35'' N |
| Longitude | 1° 30' 45.97'' E |
| Quadrant / block no. | 9 / 13 |
Breached conditions details
| Materials likely to float on sea surface or in water column | No |
|---|---|
| Materials lost to sea resting on sea bed | Yes |
Formal investigation
| Formal investigation ever opened | No |
|---|