Back

IRS/2023/3359/PON2

Notification details

Status Completed
First observed date 27 September 2023
First observed time 13:00
Organisation involved BP EXPLORATION OPERATING COMPANY LIMITED
Installation Clair Ridge QU Platform
Field CLAIR-RIDGE [Part of CLAIR]
Latitude 60° 44' 10.0'' N
Longitude 2° 29' 39.0'' W
Quadrant / block no. 206 / 8

Breached conditions details

Materials likely to float on sea surface or in water column No
Materials lost to sea resting on sea bed Yes

Formal investigation

Formal investigation ever opened No