IRS/2023/3508/PON2
Notification details
Status | Completed |
---|---|
First observed date | 08 July 2023 |
First observed time | 17:00 |
Organisation involved | CNR INTERNATIONAL (U.K.) LIMITED |
Installation | Ninian Southern Platform |
Field | NINIAN |
Latitude | 60° 48' 20.0'' N |
Longitude | 1° 27' 1.0'' E |
Quadrant / block no. | 3 / 08 |
Breached conditions details
Materials likely to float on sea surface or in water column | No |
---|---|
Materials lost to sea resting on sea bed | No |
Formal investigation
Formal investigation ever opened | No |
---|