IRS/2024/3955/PON2
Notification details
Status | Completed |
---|---|
First observed date | 22 January 2024 |
First observed time | 15:20 |
Organisation involved | CNOOC PETROLEUM EUROPE LIMITED, COSL DRILLING EUROPE AS |
Installation | COSLInnovator |
Field | BUZZARD |
Latitude | 57° 50' 42.0'' N |
Longitude | 0° 54' 36.0'' W |
Quadrant / block no. | 01 / 20 |
Breached conditions details
Materials likely to float on sea surface or in water column | Yes |
---|---|
Materials lost to sea resting on sea bed | No |
Formal investigation
Formal investigation ever opened | No |
---|