IRS/2024/3955/PON2
Notification details
| Status | Completed |
|---|---|
| First observed date | 22 January 2024 |
| First observed time | 15:20 |
| Organisation involved | CNOOC PETROLEUM EUROPE LIMITED, COSL DRILLING EUROPE AS |
| Installation | COSLInnovator |
| Field | BUZZARD |
| Latitude | 57° 50' 42.0'' N |
| Longitude | 0° 54' 36.0'' W |
| Quadrant / block no. | 01 / 20 |
Breached conditions details
| Materials likely to float on sea surface or in water column | Yes |
|---|---|
| Materials lost to sea resting on sea bed | No |
Formal investigation
| Formal investigation ever opened | No |
|---|