Back

IRS/2024/3999/PON2

Notification details

Status Completed
First observed date 02 February 2024
First observed time 10:00
Organisation involved SPIRIT ENERGY PRODUCTION UK LIMITED
Installation Morecambe South CPP1 Platform
Field SOUTH MORECAMBE
Latitude 53° 50' 44.31'' N
Longitude 3° 35' 0.38'' W
Quadrant / block no. 110 / 3

Breached conditions details

Materials likely to float on sea surface or in water column Yes
Materials lost to sea resting on sea bed No

Formal investigation

Formal investigation ever opened No